KIA RIO

Since 2000 of release

Repair and car operation



Kia Rio
+ 1.1. Short acquaintance to the car
+ 2. Engines A3E, А5D
+ 3. Greasing system
+ 4. Cooling system
- 5. Fuel system
   5.1. Specifications
   5.2. Elements of fuel system
   5.3. A corner of an advancing of ignition
   5.4. Frequency of rotation of idling
   5.5. The gauge of a measuring instrument of the expense of air
   5.6. The detonation gauge
   5.7. The gauge of position throttle заслонки
   5.8. Check of the main relay
   5.9. Check of the relay of the fuel pump
   5.10. Check of pressure of forward and back warmed gauges of oxygen
   5.11. Check of forward and back warmed gauges of oxygen
   5.12. Pressure removal in fuel system
   5.13. Топливопроводы
   5.14. Activization of fuel system
   5.15. Check of residual pressure in fuel system
   5.16. Check of fuel pipelines
   5.17. Check of fuel atomizers
   5.18. Quick-detachable connections
   5.19. The fuel pump
   5.20. A fuel tank
   5.21. Check of system of ventilation картера (PCV)
   5.22. Check of system of catching of steams of fuel
   5.23. Check of the valve of system of catching of steams of fuel
   5.24. Check of the valve of closing of the canister
+ 6. Ignition system
+ 7. Coupling
+ 8. A transmission
+ 9. Axes and power shafts
+ 10. A suspension bracket
+ 11. Wheels and tyres
+ 12. A steering
+ 13. Brake system
+ 14. A body
+ 15. Air central air
+ 16. The electric equipment







5.6. The detonation gauge

Check

PERFORMANCE ORDER
1. Disconnect an electric socket of the gauge of a detonation and remove the detonation gauge. Fix the detonation gauge in a vice and connect the voltmeter between plugs 1 and 2.
2. A hammer sharply strike on a vice and observe of voltmeter indications.
3. Check up that the detonation gauge gives out peak pressure (less than 1).
4. If peak pressure is absent, replace the detonation gauge.

Removal

PERFORMANCE ORDER
1. Remove an arm of support of an inlet collector.
2. Disconnect a plait of wires of the gauge of a detonation.
3. Turn out a bolt and remove the detonation gauge.

Installation

PERFORMANCE ORDER
1. Establish the gauge of a detonation and fix its bolt.
2. Establish a plait of wires of the gauge of a detonation.
3. Establish an arm of support of an inlet collector.